Prefabricated steel materials storage

본문 바로가기


Home > Product > Prefabricated steel materials storage
Selling leads
Prefabricated steel materials storage
Posting date : Aug 17, 2017
Membership
Free Member Scince Jul 19, 2017
FOB Price
USD 39-79
Min. Order Quantity
1 set
Supply Abillity
more than 12000 tons every year
Port
Shenzhen or Guangzhou
Payment Terms
By T/T
Package
non-packed or steel frame packed
Keyword :
Category
Contact
Daffy Leung
Selling Leads Detail
Company Info
 
Quick Detail
Place of Origin
China [CN]
Brand Name
SBS
Model Number
Steel structure PSMS
HS-CODE
84-
Package & Delivery Lead Time
Package
non-packed or steel frame packed
Delivery Lead Time
20-45 days
Detailed Description
  • Place of origin : Guangdong,China
  • Model Number : Steel structure PSMS
  • Price Terms : FOB price
  • Payment Terms : By T/T
  • Package : Seaworthy
  • Minimum Order : 1 set
  • Delivery Time : 20-45 days
  • Brand Name : SBS
  • 1. The detail material for the steel structure

    The steel structure material is included the H section,I section,Square tube,Circular Tube,Floor decking steel sheet,C section,Z section,Angle iron , Steelbar ,Steel plate.

  • The International Steel Structures provides an international forum for a broad classification of technical papers in steel structural research and its applications. The journal aims to reach not only researchers, but also practicing engineers. Coverage encompasses such topics as stability, fatigue, non-linear behavior, dynamics, reliability, fire, design codes, computer-aided analysis and design, optimization, expert systems, connections, fabrications, maintenance, bridges, off-shore structures, jetties, stadiums, transmission towers, marine vessels, storage tanks, pressure vessels, aerospace, and pipelines and more.

  • 3. The steel structure building has the advantages of wide span, high strength, light weight, low cost, temperature protection, save energy,beautiful appearance,

        short construction time, good effect of insulation, long using life, space-efficient, good seismic performance, flexible layout,etc.

    1) Wide span: even though without middle column,the max span clear distance of single span or multiple spans can be 36m

    2) Low cost: unit price range from USD35 to USD70/square meter FOB according to customer’s request.

    3) Fast construction and easy in installation,can efficiently save the manpower.

    4) Long service life: more than 50 years.

    5)  Environmental protection, stable structure, earthquake resistance, water proofing, and energy saving.

  • Our most popular line of pre-fabricated steel material buildings provide safe, convenient storage of chemicals, solvents, paints, and other hazardous materials. This number one choice of hazardous materials storage professionals offers excellent protection and ease in use. A variety of sizes is available.Our pre-engineered steel warehouse building kit was 50’ X 80’ and 16’ high, complete with insulation. It included 2 large roll-up doors so deliveries were quick and easy. It allowed for one truck to be loaded in one opening and another truck to unload in the other opening. The client received a multi purpose modern steel storage building that was aesthetically pleasing to the eye both inside and out. Their new prefab steel warehouse was really a show gallery for contractors and designers and not so much the general public, and they couldn’t have been more pleased with the final product.


ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top