Temperature Cycling Test Chambers

본문 바로가기


Home > Product > Temperature Cycling Test Chambers
Selling leads
Temperature Cycling Test Chambers
Posting date : Aug 22, 2018
Membership
Free Member Scince Jul 13, 2018
FOB Price
Negotiable
Min. Order Quantity
1 set
Supply Abillity
50000 sets per year
Port
Shenzhen,Hongkong,Guangzhou
Payment Terms
1,100% T/T; 2, Alibaba Trade Assurance;3,30% TT+70% L/C or 100% L/C at sight.
Package
Export Wooden case
Keyword :
Category
Contact
Ben Zhao
Selling Leads Detail
Company Info
 
Quick Detail
Place of Origin
China [CN]
Brand Name
GRANDE
HS-CODE
-
Package & Delivery Lead Time
Package
Export Wooden case
Delivery Lead Time
1 working day
Detailed Description
Fast change rates testing chamber is suitable for testing the changes of instruments,electrical,electronic products,machine and parts under the rapid temperature change or the the gradient conditions, takes advantage of compact, modern scroll compressors to bring fast temperature cycling to small form factor. Temperature cycling rates from 5 to 20°C/min. are possible. Two different ultimate low temperatures are available: -40°C or -70°C.
The faster cycle times can be used to meet more aggressive test methods that require thermal stress during transitions. Significant test time can be saved in completing tests, as well.
To demonstrate performance, Grande uses the international standard IEC 60068 3-5 measured at the supply air. Temperature cycles are run from hot  to cold extremes, and the middle 80% of the transition is timed to determine performance. Your actual cycling results will vary depending on methodology, including the start and end temperatures, and the amount of samples loaded.
Features
QUALITY CONSTRUCTION
Stainless steel exterior and interior
Rounded interior corners for easy cleaning
Full thermal break around doorframe and door
Rotating door latch is easy and secure
Dual-layer insulation of fiberglass and expanded foam for thermal integrity
One 2" (50mm) to One 4" (100mm)  diameter cable port on the left, with an impervious, flexible silicone plug
Easy lift-off service panels
Pressure relief port to allow air volume changes due to rapid temperature changes
Three levels of overheat protection

FTF PROGRAMMER/CONTROLLER

Popular PID controller with touch-screen operation
Stores 120 different profiles with up to 1200 steps each (ramp, soak, jump, auto-start, end)
Step types include: ramp, soak, jump, auto-start, and end
Ethernet interface for remote monitoring and operation
RECOMMENDED OPTIONS
Dry air purge, to compensate for quickly shrinking air during cooling, as well as to reduce risk of condensation.
Product temperature control, allows feedback from a second sensor on the product. Ensures faster completion of transition steps.
Technical parameters:
Model No
GTC-225
GTC-306
GTC-408
GTC-800
GTC-1000
Working room(L)
225
306
408
800
1000
Working room(L)
500*750*600
600*850*600
600*850*800
1000*1000*800
1000*1000*1000
Inner chamber size(mm)W*H*D 
1500*1930*1550
1600*2030*1550
1600*2030*1750
2100*2280*1950
2100*2280*1950
G.W.(KGs)
320
350
400
600
700
Testing temperature range
-70~-150℃(KS);-40~-150℃(KL);-20~150℃(KR)
Rapid Changes Temp.Range
-70℃:-50~+85℃(KS);-40℃:-20~+85℃(KL);-20℃:0~+85℃(KL) 
Heating & Cooling Rate
3°C/min, 5°C/min, 8°C/min, 10°C/min, 15°C/min,20°C/min,25°C/min,,30°C/min linear average or nonlinear average
Performance
Temperature range
-80℃,-73℃,-60℃-40℃,-20℃,0℃,+150℃,+180℃,+200℃
Humidity range
20%RH ~98%RH(10%RH ~98%RH or 5%RH ~98%RH)
Temp.fluctuation
±2.0℃
Temp.Uniformity
±1.5℃
Temp.resolution
0.01℃
Heating rate
-70~150℃<60min;-40~150℃<50min;+20~150℃<35min
Cooling rate
+20~-70℃<70min;+20~-40℃<55min;+20~-20℃<35min
Material
Exterior chamber material
Stainless steel plate+ powder coated
Inner chamber material
SUS#304 stainless steel plate
Insulation Material
PU & Fiberglass wool
System
Air circulation system
Cooling fan
Fan
Sirocco fan
Heating System
SUS#304 stainless steel high-speed heater
Air flow
Forced Air Circulation(It enters at bottom and leaves at top)
Humidification system
Surface evaporation system
Refrigeration system
Imported compressor,Tecumseh compressor,finned type evaporator,air(Water)-cooling condenser
Refrigerating fluid
R23/ R404A USA Honeywell.
Condensation
Air(Water)-cooling condenser
Dehumidifying system
ADP critical dew point cooling/dehumidifying method
Controlling system
PID Digital electronic indicators+S.S.R.With PID automatic calculation capability
Operation interface
Grande Expertise in Temperature & Humidity Controller,Chinese-English Shift.
Controller
Programmable capability
Save 120 profiles with up to 1200 steps each
Setting range
Temperature:-100℃+300℃
Reading accuracy
Temperature:0.01℃
Input
PT100 or T Sensor
Control
PID control
Communication interface
Equipped with standard communication interface devices USB,RS-232 and RS-485,enable the test chamber to be connected with personal computer(PC),to achieve multi-machine control and management at the same time.Standard: USB external memory port.Optional: RS-232, RS-485, GP-IB, Ethernet
Print function
Japan Yokogawa Temperature Recorder(Optional accessories)
 Auxiliary
Limit Alarm,Self Diagnosis,Alarm Display(Failure Cause),Timing device(Automatic Switch)
Accessories
Multi-layer vacuum glass observation window,Cable port(50mm),Controlling status indicator lamp,Chamber light,Specimen loading shelf(2pcs,position adjustable),Guaze 5pcs,Operation manual 1 set.
Safety protection device
Over-heat protection circuit breaker,Compressor overload protection,Control system overload protection,Humidifying system overload protection,Overload indicator lamp.
Power supply
AC 1Ψ 110V;AC 1Ψ 220V;3Ψ380V 60/50Hz
Customized service
Welcome to Non-standard,Specail requirements,OEM/ODM orders.
The technical information will be subjected to change without notice
 
Optional accessories
1,Inner glass door with manual operating ports.
2,Temp./Humi.Recorder.
3,RS-485 interface can be linked to Personal computer(PC) and achieve multi-level control & recording software management.
4,Liquid nitrogen(LN2)/Liquid Carbon Dioxide(LCO2) fast cooling-down system.
 

ECROBOT CO., Ltd, Business Registration Number : 220-88-71747, CEO J.W.Park, TEL : +82-2-552-7676, E-mail : E-mail : Contact us
Address : (Hwanghwa B/D 11F, Yeoksam-dong)320, Gangnam-daero, Gangnam-gu, Seoul, South Korea
About Us Privacy Policy Terms of use Copyright © 2000-2024 ECROBOT.COM. All rights reserved.
Top